pm-mvp-scope

Phase 5 exit - MVP scope decision and Delivery Stripe assignment per feature

/pm-mvp-scope▊

When to use

Phase 5, after pm-features-list is approved and (optionally) pm-prioritize has run. This is the Phase 5 exit artifact. pm-stripe uses the output of this skill to orchestrate the JIT build cycle.


What it produces

Two updates to existing artifacts (not new files):

  1. phase field per feature in feature_list.md and each Feature Card frontmatter:

    • MVP (or project's first phase label, e.g. P0) = in scope for MVP
    • MVP+ or later phase = post-MVP
    • Removed from list = cut
  2. stripe field per feature in feature_list.md and each Feature Card frontmatter:

    • Assigns each feature to a Delivery Stripe (parallel development channel)
    • Example: stripe-checkout, stripe-auth, stripe-notifications
    • Stripe = domain-coherent delivery channel; one feature active per stripe at a time

After user approval: updates Notion Feature entries with phase and stripe values.


How to invoke

/pm-mvp-scope           # interactive
/pm-mvp-scope --agent   # autonomous draft, requires review before finalizing

The phase field is the single source of truth for MVP membership

Never use a separate mvp: true/false flag. MVP membership is recorded in phase. Two fields on the same axis drift apart.

ValueMeaning
MVP (or project's P0/Phase 1)In scope for MVP
MVP+ (or Phase 2, Phase 3...)Post-MVP
Feature removedCut - not building

Delivery Stripes

Stripes are parallel domain-focused development channels. Each stripe operates independently - one feature active per stripe at a time, progressing through the JIT cycle.

Stripe assignment rules:

  • Features in one stripe must belong to a coherent domain slice
  • A feature cannot be assigned to a stripe where one of its dependencies is in a different stripe still in progress
  • Cross-stripe dependencies are surfaced as risks before finalizing assignment

How stripes work in Phase 6: pm-stripe orchestrates the JIT cycle per stripe - picking the next ready feature and routing it through pm-feature-design → build → review → shipped. See docs/phase-6-build/pm-stripe.md.


When features already carry a phase (Rebuild)

If features already carry phase assignments from pm-product-roadmap (e.g., a Rebuild where roadmap split into P0 Pilot / P1 / P2):

  • The MVP cut is already decided - do NOT re-litigate IN/POST
  • This skill's job is only stripe assignment
  • Confirm the phase-derived cut with the user, then assign stripes

When a workbench prototype already made the cut

A prototype folder under prototypes/ whose meta.md says Purpose: workbench was built wider than the MVP and then cut down by roadmap phase, so its feature-plan-prt.md already carries a phase per built feature. The skill detects it in the state check and reads that split as the proposal instead of deriving a cut from KANO/V×C from scratch.

Feature isPhase is read fromWhat happens
Promoted (Feature Card with promoted_from:)Feature Card and feature_list.mdPhase read, stripe assigned
Still PRT-, built, phase setfeature-plan-prt.mdShown as the proposed IN / later split; no stripe yet
Still PRT-, built, no phase-Undecided - routed to /pm-prototype, not placed here
next / cut in the planfeature-plan-prt.mdCarried into Post-MVP / Cut with the recorded reason
No prototype counterpart-The normal cut
  • Offered, not imposed - the split is shown with the folder it came from and you confirm or change it.
  • Promotion does not happen here. PRT- features become Feature Cards with real FEAT- IDs through /pm-prototype, phase by phase. A PRT- ID is never written into feature_list.md, a card, or a stripe; unpromoted first-phase features are listed as awaiting promotion and get their stripe on the re-run.
  • Matched by reference (promoted_from: or the prototype's targets), never by a similar name.
  • A workbench split is stakeholder alignment, not user evidence - the capacity check against team size and timeline still runs.

Dependencies

Required before running:

  • pm-features-list - must include Dependency Map, KANO Analysis, and V×C Matrix (all approved)

Recommended:

  • pm-prototype (workbench) - if the MVP was cut down in a workbench prototype, its feature plan is the proposed phase split
  • pm-prioritize - recommended to run before MVP scope if priority order has been updated
  • pm-kpis - North Star and AARRR metrics validate MVP scope alignment
  • pm-business-case - revenue model and runway inform how aggressive the MVP cut should be

Produces for:

  • features/feature_list.md - phase and stripe updated per feature
  • /features/cards/FEAT-*.md - phase and stripe fields updated in each Feature Card
  • pm-product-roadmap (v3) - delivery view populated with stripe and phase data
  • pm-stripe - uses stripe assignments to orchestrate the JIT cycle per stripe

Related skills: pm-features-list, pm-prioritize, pm-product-roadmap, pm-stripe, pm-entity-registry, pm-prototype